Missouri building permit offices
This directory lists 9 counties in Missouri whose own permit page we retrieved and read. Each entry links to that official source rather than to a copy of it, and states the date it was last checked.
Quick answer
- Missouri has 9 counties listed in this directory.
- Missouri has no statewide building code; local jurisdictions adopt their own.
- Counties in Missouri issue building permits for unincorporated territory; incorporated cities and towns issue their own.
- 8 publish a direct building department telephone number.
- Compiled from official sources and last reviewed on 2026-08-06.
Which building code applies in Missouri?
Missouri has no statewide building code; local jurisdictions adopt their own. That has a practical consequence people regularly get caught by: adoption happens jurisdiction by jurisdiction, so two properties a short drive apart can sit under different code editions with different local amendments. Guidance written for a neighbouring county may simply not apply to yours.
The practical rule in Missouri is to confirm the adopted edition with the office that has jurisdiction before relying on anything — including anything on this site. We name the office and link its source; the edition it currently enforces is a question only it can answer.
Separately from the code, permit fees, exemption thresholds and review times are set locally everywhere in Missouri. We do not publish any of those figures — see our methodology for why.
Counties covered in Missouri
| County | Portal and contact as published |
|---|---|
| Camden County | (573) 346-4440 |
| Christian County | (417) 275-6331 |
| Clay County | (816) 407-3600 |
| Franklin County | (636) 583-6369 |
| Johnson County | (660) 747-9822 |
| McDonald County | Official source listed |
| Pettis County | (660) 826-5000 |
| Platte County | (816) 858-2232 |
| Ralls County | (573) 985-7111 |
Who issues building permits in Missouri?
Counties issue permits for unincorporated territory. If a property sits inside an incorporated city or town, that municipality issues the permit and the county has no role in it. Applying to the wrong one is the most expensive routine mistake in permitting, because you do not find out until intake rejects the package.
A city mailing address is not evidence either way. Postal routes and municipal boundaries are drawn by different organisations for different reasons and frequently disagree, which is why properties on the edge of a growing Missouri city so often turn out to be unincorporated. Look the property up in the county parcel or GIS viewer; the record names the jurisdiction.
Other agencies can hold part of the review even once the building department is settled: the health department for septic and wells, public works or the state transportation department for driveway access and right-of-way work, the fire district for access and sprinklers, and state agencies for elevators, boilers, floodplain and coastal work. Each runs on its own timeline, so start them in parallel. Our jurisdiction helper works through the indicators.
Are Missouri permit records public?
Yes. Permit records are public records in Missouri, and you do not need to own the property to obtain them — which is exactly how buyers and their inspectors check a house before closing.
None of the counties listed here publish an online permit search that we could verify, so records are obtained by request to the office. Give the property address and parcel number and ask for the permit history including inspection records.
Search by parcel number rather than street address wherever the option exists. Addresses are renumbered and re-suffixed over the decades; parcel numbers usually survive. And a search that returns nothing on an older property is weak evidence of unpermitted work — most jurisdictions loaded only records created in their current software, with cut-offs in the 1990s and 2000s being normal.
Counties not listed here
This directory lists only jurisdictions whose official permit page we could retrieve and read. Where a county is missing it is because its page was unreachable, blocked automated retrieval, or carried too little detail to describe honestly — not because it does not issue permits. We would rather list nothing than list an office we have not confirmed. The standard is set out here, and you can send us a missing office.
Missouri building permit FAQ
Who issues building permits in Missouri?
Counties issue permits for unincorporated territory in Missouri; incorporated cities and towns issue their own. Because Missouri has no statewide building code; local jurisdictions adopt their own, the adopted edition and local amendments differ between jurisdictions, so confirm with the specific office.
How do I find my county building department in Missouri?
Confirm jurisdiction first by looking the property up in the county parcel or GIS viewer, then use the table on this page. If the parcel record names a city, contact that municipality instead — the county will not have the record.
Do I need a building permit in Missouri?
For structural work, new footprint, electrical or plumbing that moves, mechanical replacement, roofing, demolition or any change of use, yes. For purely cosmetic work, generally no. The exemption thresholds — shed size, fence height, repair value — are set by each county rather than by Missouri, and they are the part that differs between neighbouring jurisdictions.
How much does a building permit cost in Missouri?
There is no statewide figure, and any site quoting one is guessing. Fees are set by local ordinance, usually calculated from declared project valuation, with plan review, separate trade permits and surcharges added. Read the fee schedule published by the specific county — every jurisdiction page here links to it where one is published.
Are Missouri building permit records public?
Yes, in every state including Missouri. Request the history from the building department by address and parcel number.
What building code does Missouri use?
Missouri has no statewide building code; local jurisdictions adopt their own. Adoption is decided jurisdiction by jurisdiction, so confirm the current edition with the office that has authority over your property.
Can a homeowner pull their own permit in Missouri?
In most Missouri jurisdictions yes, for a home you own and occupy, by signing an owner-builder declaration. It transfers liability for the work to you and can restrict resale for a period. Read the declaration before signing it, and be wary of a contractor who asks you to pull the permit for them.
How long does a building permit take in Missouri?
It depends on the jurisdiction, the season, current staffing and how complete your submission was, so we publish no figure. Ask the office for their current review time when you submit. The variable you control is the correction round: answering every comment in one complete resubmission rather than piecemeal routinely halves the elapsed time.
What happens if work was done without a permit in Missouri?
Retroactive permitting is a normal process. Expect a penalty — commonly a doubling of the permit fee — and be prepared to expose concealed work for inspection. Unpermitted work found by a buyer's inspector costs far more than the same work disclosed voluntarily, because it is discovered under time pressure.
Is a permit needed to replace a roof or water heater in Missouri?
Usually yes for both, in most Missouri jurisdictions. Re-roofing is permitted so an inspector can verify underlayment, flashing and the number of existing layers; water heater replacement is permitted because of combustion air and venting requirements. Confirm with the specific county, since this is one of the thresholds that varies.